Alterations to existing buildings
In its broadest sense, alteration can be defined as: ‘Work intended to change the function or appearance of a place.’ Ref Conservation Principles, Policies and Guidance, For the sustainable management of the historic environment, Published by Historic England in 2008.
Existing buildings often undergo alterations during their life to change, modify or improve their performance or the nature of their use.
Common examples of alterations include:
- Total or partial change of use.
- Extension.
- Partial demolition.
- Linking or separating spaces.
- Making or closing openings.
- Retrofitting a new a component or feature.
- Refurbishing an existing a component or feature.
- Renovating an existing component or feature.
- Repairing an existing component or feature.
- Maintenance.
- Decoration.
Some alterations may require planning permission. Other alterations may be considered 'permitted developments' for which planning permission is not required.
Examples of permitted developments include; certain enlargements or alterations to houses, construction of some sheds and fuel storage containers, certain porches, doors and windows, and so on. The best way to determine whether a development is permitted or not is to ask the local planning authority.
For more information see: Permitted development.
Responsibility for determining panning permissions generally lies with local planning authorities (usually the planning department of the district or borough council).
For more information see: Planning permission.
The building regulations may also apply to alterations. The building regulations set out:
- What qualifies as ‘building work’ and so falls under the control of the regulations.
- What types of buildings are exempt (such as temporary buildings).
- The notification procedures that must be followed when starting, carrying out, and completing building work.
- Requirements for specific aspects of building design and construction, such as; structure, drainage, fire safety, conservation of fuel and power, access for people with disabilities and so on.
Building regulations approvals can be sought either from the building control department of the local authority or from an approved inspector.
For more information see: Do the building regulations apply to existing buildings?
On larger projects, the The Construction (Design and Management) Regulations (CDM regulations) may also apply. The CDM regulations are intended to ensure that health and safety issues are properly considered during a project’s development so that the risk of harm to those who have to build, use and maintain structures is reduced.
For more information see: CDM regulations.
NB The 2018 International Residential Code (IRC), published by the International Code Council (ICC) defines alteration as: ‘Any construction, retrofit or renovation to an existing structure other than repair or addition that requires a permit. Also, a change in a building, electrical, gas, mechanical or plumbing system that involves an extension, addition or change to the arrangement, type or purpose of the original installation that requires a permit.’
[edit] Related articles on Designing Buildings
- Building regulations.
- CDM.
- Change of use class.
- Do the building regulations apply to existing buildings?
- Flexbury Church.
- Henry Boot Construction Ltd v Alstom Combined Cycles.
- International Existing Building Code (IEBC).
- Material change of use.
- Planning digital signage in new buildings.
- Planning permission.
- Permitted development.
- Refurbishment.
- Renovation.
- Retrofit.
Featured articles and news
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.